Removal (page 2 of 5)
- Make
- Aston Martin
- Model
- DB9 Factory Workshop Manual
- Year
- Issue 2, 2005
- Section
- Air Conditioning (A/C) System
12 Climate controlRemoval · page 2 of 5
Install new ‘O’ rings.
Apply compressor oil to the ‘O’-ring joints.
- Install the expansion valve to the A/C unit body.
- Install the A/C pipes to the expansion valve.
- Install the A/C pipes clamp.
- Install sealant around the evaporator pipes.
- Install the in-vehicle temperature pipe to the A/C unit clips.
- Carry out A/C system actuator check and functional check to ensure correct operation (Refer to ‘A/C System Testing’, page 12-3-9)
- Connect the vehicle battery. Start the engine. Allow the engine cooling system to rise to normal running temperature.
- Carry out A/C system actuator check and functional check to ensure correct operation (Refer to ‘A/C System Testing’, page 12-3-9).
Parts & tools for this job For 2005 Aston Martin DB9
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Aston Martin DB9 2005 cabin filter
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.