CYLINDER HEAD - Nissan 200SX S12 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 200SX Nissan 200SX S12 1986 Workshop Manual
- Section
- General › CYLINDER HEAD - Nissan 200SX S12 Workshop Manual
CYLINDER HEAD
CYLINDER HEAD
Installation (Cont'd) Install rocker shaft with rocker arms. 4,
6. Adjust valve clearance. ‘To prevent rocker shaft springs from slipping out Valve clasrance of rocker shafts, insert bracket bolts into shaft, Unit: cam {in} © SS Front merck Is punched.
| COLD" | HOT | |
|---|---|---|
| Intake | 0.21 (9.008) | 0,30 (0.012) |
| Exhaust | 0.23 {0.009} | 0.30 (0,012) |
“*: At temperature 20°C (68°F)
nak
Front CP
Exhaust SEM? 700
5. Tighten rocker shatt bolts. © Tighten bolts gradually, in two or three stages outwardly from center position. © Make sure that rocker arm adjusting screw is fully toosened.
SEMDBSA 18-22Nm ML:
(18 -2.2 kgm, 13 - 16 ft-lb)
EM-18
Parts & tools for this job For Nissan 200SX
- PARTEngine gasket setSearch: Nissan 200SX engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.