Description (page 14 of 16)
- Make
- Alfa Romeo
- Model
- GTV / Spider GTV and Spider (916) Factory Service Manual
- Year
- 1995–2000
- Section
- Removal/Refitting
Variants – 3.0 V6 24VDescription · page 14 of 16
- Slacken the power unit support fastening screw on the gearbox side.
- Lower the power unit with the hydraulic jack just enough to disconnect the gear control cable.
WARNING: The hydraulic jack must have a capacity of at least 1000 kg. Release the electric cables from any wire stays and move them away from the engine, to prevent them from getting stuck in the engine when it is removed.
- Completely lower the hydraulic jack and remove the power unit from the engine compartment.
WARNING: During the lowering operation make sure that there are no cables or pipes still connected. Take due care not to damage any component.
- In addition to the hydraulic jack used for removal, support the power unit with a hydraulic hoist restraining as illustrated.
Parts & tools for this job For 1995 Alfa Romeo GTV / Spider
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Alfa Romeo GTV / Spider
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.