Workshop Manuals Factory service & repair Rover
01 Introduction02 General information03 Information04 Maintenance05 Engine - K Series06 Engine - D Series07 Engine - L Series08 Engine - T Series09 Emission control10 Engine management system - MEMS11 Engine management system - PGMFi12 Engine management system - EDC13 Fuel delivery system14 Cooling system15 Cooling system - L Series16 Manifold & exhaust systems17 Clutch18 Manual gearbox - R6519 Manual gearbox - PG120 Automatic gearbox21 Drive shafts22 Steering23 Suspension24 Brakes25 Restraint systems26 Body27 Heating & ventilation28 Air conditioning29 Wipers & washers30 Electrical31 Instruments
Rover 400 Workshop Manual (1995-2000)08 · Engine - T Series
08 · Engine

Engine steady bar - lower

Make
Rover
Model
400 Workshop Manual
Year
1995–2000
Section
Repairs › Engine steady bar - lower
Engine - T SeriesEngine steady bar - lower

ENGINE STEADY BAR - LOWER

Service repair no - 12.45.17

Remove

  1. Disconnect battery earth lead.
  2. Raise front of vehicle.

WARNING: Support on safety stands.

Engine steady bar - lower – Raise front of vehicle.
  1. Remove bolt securing steady bar to engine sump bracket.
  2. Remove bolt securing steady bar to rear beam.
  3. Remove steady bar.

Refit

  1. Clean area of subframe where engine steady bar is fitted.
  2. Position steady bar to rear beam, fit through bolt but DO NOT tighten.
  3. Align steady bar to engine sump bracket, fit though bolt and tighten to 80 Nm.
  4. Tighten bolt securing steady bar to rear beam to 80 Nm.
  5. Remove stand(s) and lower vehicle.
  6. Connect battery earth lead.

FLYWHEEL

Service repair no - 12.53.07

Remove

  1. Remove clutch assembly. See CLUTCH, Repairs.
  2. Remove crankshaft position sensor. See ENGINE MANAGEMENT SYSTEM - MEMS, Repairs.
Flywheel – Remove crankshaft position sensor. See ENGINE MANAGEMENT SYSTEM - MEMS, Repairs.
  1. Remove 4 bolts from crankshaft pulley.
  2. Fit tool 18G 1641 to crankshaft pulley, using 2 pulley bolts.
Flywheel – Fit tool 18G 1641 to crankshaft pulley, using 2 pulley bolts.
  1. Remove and discard 6 bolts securing flywheel.
  2. Remove flywheel from crankshaft.

Parts & tools for this job For 1995 Rover 400

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.