Workshop Manuals Factory service & repair Rover
01 Introduction02 General information03 Information04 Engine - KV605 Engine - diesel06 Engine - T Series07 Emission control08 Engine management system - MEMS09 Engine management system - EDC10 Fuel delivery system11 Cooling system - KV612 Cooling system - diesel13 Manifold & exhaust systems14 Clutch15 Manual gearbox - PG116 Manual gearbox - T75017 Automatic gearbox - JF403E18 Drive shafts19 Steering20 Brakes21 Restraint systems22 Body23 Air conditioning24 Wipers & washers25 Electrical26 Instruments
Rover 800 Workshop Manual (1996-1999)09 · Engine management system - EDC
09 · Engine

Throttle cable - adjust (Engine management system - EDC) (page 2 of 2)

Make
Rover
Model
800 Workshop Manual
Year
1996–1999
Section
Adjustments
Engine management system - EDCThrottle cable - adjust · page 2 of 2
Diagram
  1. Remove plug from rear of pump.
  2. Remove and discard sealing washer.
Remove and discard sealing washer.
  1. Fit tool 18G 1552 to pump.
  2. Fit dial gauge to tool 18G 1552 and tighten clamp.
  3. Turn crankshaft anti-clockwise until dial gauge needle stops moving.
  4. Zero gauge.
  5. Turn crankshaft clockwise until pulley is aligned with TDC mark and check reading on gauge. Injection pump setting = 0.58 - 0.62 mm.

Parts & tools for this job For 1996 Rover 800

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.