Preparation
- Make
- Alfa Romeo
- Model
- 145/146 Factory Service Manual
- Year
- 1994–1999
- Section
- Fixed bodywork components › Preparation
BodyworkPreparation
PREPARATION
Install the four brackets securing the roof-rack to the new panel as follows:
- Using a rotating brush, clean the area to be welded.
- Apply the specified electroweldable protection to the areas to be spot welded.
- Position the bracket using the attachment pin as a centering device.
- Using a spot welder, proceed as shown in the diagram.
- Using a rotating brush, clean the area to be welded along the edge of the new roof panel and the body.
- Apply the electroweldable protection to the areas to be spot welded.
POSITIONING AND INSPECTION
- Position the roof panel and join the edges to be welded together and fix using clamps.
- Check parallelism, gaps and angles and refit the mobile components removed previously with their gaskets and the parts which, when fitted, permit verification of the success of the operations.
- Using a spot welder, proceed as shown in the diagram.
- Using an oxyacetylene torch, brass braze-weld the four corners of the roof panel to the pillars.
- Using an abrasive grinding wheel, remove and flush the residues left by welding.
- Using a rotating brush, clean the welded areas.
Parts & tools for this job For 1994 Alfa Romeo 145/146
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Alfa Romeo 145/146
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.