Injection pump timing - air conditioning (Engine management system - EDC) (page 4 of 5)
- Make
- Rover
- Model
- 800 Workshop Manual
- Year
- 1996–1999
- Section
- Adjustments
Engine management system - EDCInjection pump timing - air conditioning · page 4 of 5
- Remove nut securing top hose clip to bracket.
- Release clip and move top hose aside.
- Remove bolt securing air conditioning pipe clip to PAS pump pulley shield.
- Remove 1 and loosen 2 bolts securing PAS pump pulley shield and remove shield.
- Fit lifting eye to PAS pump bracket.
- Attach lifting hoist to lifting eye and take weight of power unit without exerting load on mountings.
- Remove engine RH mounting through bolt and collect special nut.
- Raise engine approximately 50 mm.
- Remove bolt securing ancillary belt jockey pulley.
NOTE: LH thread.
- Remove pulley.
Parts & tools for this job For 1996 Rover 800
- PARTGlow plugsSearch: Rover 800 1996 glow plugs
- TOOLGlow plug socketSearch: glow plug socket
- TOOLDiesel compression testerSearch: diesel compression tester
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.