Workshop Manuals Factory service & repair Rover
01 Introduction02 General information03 Information04 Engine - KV605 Engine - diesel06 Engine - T Series07 Emission control08 Engine management system - MEMS09 Engine management system - EDC10 Fuel delivery system11 Cooling system - KV612 Cooling system - diesel13 Manifold & exhaust systems14 Clutch15 Manual gearbox - PG116 Manual gearbox - T75017 Automatic gearbox - JF403E18 Drive shafts19 Steering20 Brakes21 Restraint systems22 Body23 Air conditioning24 Wipers & washers25 Electrical26 Instruments
Rover 800 Workshop Manual (1996-1999)09 · Engine management system - EDC
09 · Engine

Injection pump timing - air conditioning (Engine management system - EDC) (page 4 of 5)

Make
Rover
Model
800 Workshop Manual
Year
1996–1999
Section
Adjustments
Engine management system - EDCInjection pump timing - air conditioning · page 4 of 5
Diagram
  1. Remove nut securing top hose clip to bracket.
  2. Release clip and move top hose aside.
  3. Remove bolt securing air conditioning pipe clip to PAS pump pulley shield.
  4. Remove 1 and loosen 2 bolts securing PAS pump pulley shield and remove shield.
Remove 1 and loosen 2 bolts securing PAS pump pulley shield and remove shield.
  1. Fit lifting eye to PAS pump bracket.
  2. Attach lifting hoist to lifting eye and take weight of power unit without exerting load on mountings.
Attach lifting hoist to lifting eye and take weight of power unit without exerting load on
  1. Remove engine RH mounting through bolt and collect special nut.
  2. Raise engine approximately 50 mm.
Raise engine approximately 50 mm.
  1. Remove bolt securing ancillary belt jockey pulley.

NOTE: LH thread.

  1. Remove pulley.

Parts & tools for this job For 1996 Rover 800

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.