Models with air conditioning
- Make
- Rover
- Model
- 600 Repair Manual Supplement
- Year
- 1993–1999
- Section
- Repairs › Models with air conditioning
Fuel delivery system - L SeriesModels with air conditioning
- Remove coolant outlet elbow, remove and discard seal.
- Remove 3 nuts securing feed leads to glow plugs.
- Release feed lead from terminal and remove link lead.
- Remove 3 glow plugs.
Refit
- Thoroughly clean glow plugs and glow plug seating area in cylinder head.
- Apply a suitable anti-seize compound to threads of glow plugs.
- Fit glow plugs and tighten to 20 Nm.
- Fit terminal and feed leads to glow plugs.
NOTE: Harness feed lead must be connected to glow plug No. 2.
- Tighten terminal nuts to 2.5 Nm.
- Clean mating faces of coolant outlet elbow and cylinder head.
- Fit new seal to coolant outlet elbow.
- Fit coolant outlet elbow to cylinder head, fit bolts and tighten to 25 Nm.
- Connect radiator top hose to coolant outlet elbow and tighten clip.
- Align dipstick tube bracket to coolant outlet elbow and secure with bolt.
- Connect temperature gauge sensor lead.
- Connect multiplug to coolant temperature sensor.
Models with air conditioning
- Fit alternator. See ELECTRICAL, Repairs.
- Fit plenum chamber. See FUEL DELIVERY SYSTEM, Repairs.
- Fit hose intercooler to plenum and tighten clips.
- Fit engine acoustic cover. See BODY, Exterior fittings.
- Refill cooling system. See COOLING SYSTEM - ’L’ SERIES, Adjustments.
- Connect battery earth lead.
Parts & tools for this job For 1993 Rover 600
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Rover 600 1993 cabin filter
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.