Freelander Service Procedures
EMISSION CONTROL
REPAIRS 17-1-13
8. Remove 2 bolts and remove RH heat shield.
9. Release post catalyst HO2S harness from
clips.
10. Release and disconnect post catalyst HO2S
multiplug.
11. Remove 2 bolts securing pipe clamp and
remove clamp.
12. Remove 2 nuts securing catalyst, remove
catalyst and discard gasket.
NOTE: Do not carry out further dismantling if
component is removed for access only.
13. Identify and remove both H02S from catalyst.
Refit
1. Clean H02S and mating faces.
2. Fit both H02S and tighten to 55 Nm (40 lbf.ft).
3. Clean catalyst and mating face.
4. Using a new gasket, fit catalyst and fit nuts but
do not tighten at this stage.
5. Fit clamp, fit bolts but do not tighten at this
stage.
6. Connect post catalyst H02S multiplug and fit to
bracket.
7. Fit harness into clips.
8. Fit heat shields and tighten bolts to 10 Nm (7
lbf.ft).
9. Fit intermediate pipe and silencer.
- K SERIES KV6, REPAIRS, Intermediate
pipe - NAS.
10. Tighten nuts securing catalyst to manifold to 50
Nm (37 lbf.ft).
11. Tighten bolts securing clamp to 10 Nm (7 lbf.ft).
12. Connect pre catalyst H02S multiplug and fit to
bracket.
13. Fit harness into clips.
14. Fit acoustic cover.
ENGINE - K SERIES KV6, REPAIRS,
15. Connect battery earth lead.
M19 3482