Engine and gearbox assembly - sequential auto (EM-CVT)
- Make
- MG
- Model
- MGF Factory Workshop Manual
- Year
- 1995–2000
- Section
- Repairs › Engine and gearbox assembly - sequential auto (EM-CVT)
EngineEngine and gearbox assembly - sequential auto (EM-CVT) · page 1 of 9
ENGINE AND GEARBOX ASSEMBLY - SEQUENTIAL AUTO (EM-CVT)
Service repair no - 12.37.01/99
Remove
- Disconnect battery earth lead.
- Remove engine compartment access panel. See BODY, Exterior fittings.
- Remove engine cover. See this section.
- Drain transmission fluid. See AUTOMATIC GEARBOX - ’EM-CVT’, Adjustments.
- Drain cooling system. See COOLING SYSTEM, Adjustments.
- Models with A/C: Evacuate A/C system. See AIR CONDITIONING, Adjustments.
- Release clips securing air intake pipe between air cleaner and throttle body.
- Remove air intake pipe.
- Release clip and pipe running from evaporative emission cannister purge valve to throttle body.
- Disconnect throttle cable from throttle body abutment and throttle cam.
- Release throttle cable from inlet manifold clip and position cable aside.
- Position absorbent cloth around fuel filter, loosen union to relieve fuel pressure, retighten to 30 Nm.
- Release quick release connector securing fuel pipe to injector rail hose.
- Evacuate hydragas system. See SUSPENSION, Adjustments.
Parts & tools for this job For 1995 MG MGF
- PARTEngine gasket setSearch: MG MGF 1995 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.