Engine and gearbox assembly - sequential auto (EM-CVT) (page 5 of 9)
- Make
- MG
- Model
- MGF Factory Workshop Manual
- Year
- 1995–2000
- Section
- Repairs
EngineEngine and gearbox assembly - sequential auto (EM-CVT) · page 5 of 9
- Models with A/C: Loosen A/C pipe unions under vehicle and release pipes.
CAUTION: Immediately cap all air conditioning pipes to prevent ingress of dirt and moisture into the system.
- Place engine table underneath rear of car, and lower ramp. When engine and rear subframe are supported by table, remove 4 front bolts, and 6 rear bolts securing subframe to body.
- Collect rear anti-roll bar mounting brackets.
- Carefully raise ramp and guide engine and subframe from body.
CAUTION: Ensure subframe is securely held on engine table.
Parts & tools for this job For 1995 MG MGF
- PARTEngine gasket setSearch: MG MGF 1995 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.