Workshop Manuals Factory service & repair MG
01 Introduction02 General information03 Information04 Maintenance05 Engine06 Engine management system - MEMS07 Cooling system08 Manifold & exhaust systems09 Clutch10 Manual gearbox11 Automatic gearbox - EM-CVT12 Drive shafts13 Steering14 Suspension15 Brakes16 Restraint systems17 Body18 Heating & ventilation19 Air conditioning20 Wipers & washers21 Electrical22 Instruments
MG MGF Factory Workshop Manual (1995-2000)05 · Engine
05 · Engine

Engine and gearbox assembly - sequential auto (EM-CVT) (page 3 of 9)

Make
MG
Model
MGF Factory Workshop Manual
Year
1995–2000
Section
Repairs
EngineEngine and gearbox assembly - sequential auto (EM-CVT) · page 3 of 9
Diagram
  1. Disconnect cannister purge valve multiplug.
Disconnect cannister purge valve multiplug.
  1. Remove engine harness earth bolt from body and release 2 earth leads.
  2. Disconnect fuel return hose.
Disconnect fuel return hose.
  1. Raise vehicle on a 2 post ramp.
  2. Remove road wheel(s).
  3. Remove 2 bolts securing ABS sensors, release sensors and collect sensor spacers.
  4. Release LH and RH rear ABS sensor leads from clips.
  5. Remove nuts and bolts securing dampers to upper arms.
Remove nuts and bolts securing dampers to upper arms.
  1. Loosen unions and disconnect fluid cooler pipes from gearbox.

CAUTION: Plug the connections.

Parts & tools for this job For 1995 MG MGF

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.