Engine and automatic gearbox - models without air conditioning
- Make
- Rover
- Model
- 200 Workshop Manual
- Year
- 1995–1999
- Section
- Repairs › Engine and automatic gearbox - models without air conditioning
Engine - K16Engine and automatic gearbox - models without air conditioning · page 1 of 10
- Connect heater hose to coolant outlet elbow and tighten clip.
- Secure heater hose to clip on coolant rail.
- Connect radiator bottom hose to coolant rail and tighten clip.
- Connect radiator top hose to coolant outlet elbow and tighten clip.
- Connect drive shafts to gearbox as detailed in Differential oil seal. See AUTOMATIC GEARBOX - ’CVT’, Repairs.
- Position battery tray in vehicle.
- Tighten 3 bolts securing battery tray to body, to 10 Nm.
- Position engine compartment fuse box to body, fit bolt and tighten to 10 Nm.
- Fit 4 bolts securing battery tray to body and tighten to 10 Nm.
- Fit and tighten bolt securing engine compartment fuse box to battery tray.
- Secure ABS fuse holder to battery tray.
- Fit engine management relay module. See ENGINE MANAGEMENT SYSTEM - MEMS, Repairs.
- Fit ECM. See ENGINE MANAGEMENT SYSTEM - MEMS, Repairs.
- Fit air cleaner. See ENGINE MANAGEMENT SYSTEM - MEMS, Repairs.
- Replace receiver/dryer. See AIR CONDITIONING, Repairs.
- Adjust selector cable. See AUTOMATIC GEARBOX - ’CVT’, Adjustments.
- Remove stand(s) and lower vehicle.
- Recharge air conditioning system. See AIR CONDITIONING, Adjustments.
- Refill gearbox with fluid. See AUTOMATIC GEARBOX - ’CVT’, Adjustments.
- Refill cooling system. See COOLING SYSTEM - ’K’ SERIES, Adjustments.
- If required: Refill engine with oil. See MAINTENANCE.
- Bleed power steering system. See STEERING, Adjustments.
- Adjust throttle and kickdown cable. See AUTOMATIC GEARBOX - ’CVT’, Adjustments.
ENGINE AND AUTOMATIC GEARBOX - MODELS WITHOUT AIR CONDITIONING
Service repair no - 12.37.01.99
Remove
- Disconnect battery earth lead.
- If required: Drain engine oil. See MAINTENANCE.
- Fit new sealing washer to drain plug, fit drain plug and tighten to 42 Nm.
- Drain cooling system. See COOLING SYSTEM - ’K’ SERIES, Adjustments.
- Drain gearbox fluid. See AUTOMATIC GEARBOX - ’CVT’, Adjustments.
- Raise front of vehicle.
WARNING: Support on safety stands.
- Remove air cleaner. See ENGINE MANAGEMENT SYSTEM - MEMS, Repairs.
- Remove ECM. See ENGINE MANAGEMENT SYSTEM - MEMS, Repairs.
- Remove engine management relay module. See ENGINE MANAGEMENT SYSTEM - MEMS, Repairs.
- Release ABS fuse holder from battery tray.
Parts & tools for this job For 1995 Rover 200
- PARTEngine gasket setSearch: Rover 200 1995 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.