landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Front bulkhead assembly|Page 940 > < Panel replacement procedure|Page 937
Page 780
background image

PANEL REPAIRS

REPAIRS 77-2-25

REPAIRS

Front bulkhead assembly 

In this procedure, the crossmember gusset plates 
are replaced in conjunction with the front bulkhead 
assembly. 

Remove

1. Disconnect battery earth lead.
2. Disconnect alternator. 
3. Disconnect all ECUs.
4. Remove front bumper valance. 

 

 + 

 EXTERIOR FITTINGS, REPAIRS, 

Bumper - assembly - front - up to 04MY.

5. Remove front bumper armature.
6. Remove radiator. 

 

 + 

 COOLING SYSTEM - K SERIES KV6, 

REPAIRS, Radiator assembly.

7. Remove PAS fluid cooler. 

 

 + 

 STEERING, REPAIRS, Oil cooler - 

Td4 & K1.8 models.

8. Remove LH and RH headlamps. 

 

 + 

 LIGHTING, REPAIRS, Headlamp 

assembly - up to 04MY.

9. Release wiring to headlamps and position 

aside.

10. Remove LH and RH engine bay shields.
11. Remove bumper valance LH and RH 

attachment brackets.

12. Remove battery. 

 

 + 

 CHARGING AND STARTING, 

REPAIRS, Battery.

13. Remove air intake hose.
14. Remove horn

 

 + 

 SECURITY, REPAIRS, Horn.

15. Remove windscreen washer reservoir. 

 

 + 

 WIPERS AND WASHERS, REPAIRS, 

Reservoir - washer.

16. Remove bonnet lock.
17. Support bonnet in open position.
18. Remove bonnet stay. 

Repair

1. Remove existing panel(s), prepare panel joint 

faces and install new panel(s) in accordance 
with Panel Replacement Procedure. Punch or 
drill holes in new panel for plug welding as 
shown. 

Front bulkhead assembly|Page 940 > < Panel replacement procedure|Page 937