Assembly (Cont'd) - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › Assembly (Cont'd) - Nissan 240SX 1991-1992 Workshop Manual
Assembly (Cont'd)
ASSEMBLY
Assembly (Cont'd)
12. Install control valve assembly.
a. Install accumulator piston return springs B, C and D. Free length of return springs: Unit: mm (in)
| Accumulator | B | Cc | D | |
|---|---|---|---|---|
| Item | Free lerigth | 66 (2.60) | 45 (1.77) | 58.4 (2.299) |
SAT004B Install manual valve on control valve.
b. @ Apply A.T.F. to manual valve.
G Ic | J \
SATO05B
c. Place control valve assembly on transmission case. Connect solenoid connector for upper body.
d. Install connector clip.
SATO06B
e. Install control valve assembly on transmission case.
f. Install connector tube brackets and tighten bolts @) and @ Check that terminal assembly harness does not catch.
| Bolt symbol | mm (in) FZ} ¢ |
|---|---|
| ® | 33 (1.30) |
| 45 (1.77) |
AT-174
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.