Workshop Manuals Factory service & repair Nissan and Datsun
01 QUICK REFERENCE INDEX02 Front Cover03 Foreword04 Table of Contents05 General Information06 Windshield Header Trim07 Windshield Header Molding08 Weatherstrips and Retainers09 Rear Seat10 Quarter Trim Panel11 Quarter Window and Regulator12 Door and Door Window13 Seat Belts14 Back and Quarter Belt Moldings15 Headliner Assembly16 Top Cover Assembly17 Backlite Assembly18 Stay Pads, Side and Rear19 No. 1 Bow20 No. 2 Bow21 No. 3 Bow22 No. 4 Bow23 Rear and Side Rail24 Hydraulic System25 Electrical26 Deck Lid Hinge and Trunk Trim27 Body Structural28 Index29 Back Cover30 QUICK REFERENCE CHART
Nissan and Datsun Nissan 240SX 1991-92 Workshop Manual01 · QUICK REFERENCE INDEX
01 · General

DISCHARGING, EVACUATING, CHARGING AND CHECKING - Nissan 240SX 1991-1992 Workshop Manual

Make
Nissan and Datsun
Model
240SX Nissan 240SX 1991-92 Workshop Manual
Section
General › DISCHARGING, EVACUATING, CHARGING AND CHECKING - Nissan 240SX 1991-1992 Workshop Manual
QUICK REFERENCE INDEXDISCHARGING, EVACUATING, CHARGING AND CHECKING - Nissan 240SX 1991-1992 Workshop Manual

DISCHARGING, EVACUATING, CHARGING AND CHECKING

DISCHARGING, EVACUATING, CHARGING AND CHECKING

Setting of Service Tools (Cont'd)

1. Install adapter valve to each of high pressure and low pres- sure service valves. Before connecting adapter valve, turn adapter valve handle fully counterclockwise to retract pin. Connect to

2. Connect charging hoses to adapter valves and connect vac- charging hose uum hose to vacuum pump.

3. Run vacuum pump and open additional valve and both Opens valves on gauge manifold set.

4. After evacuating unwanted air in gauge set, close addi- On-vehicle service tional valve and stop vacuum pump. valve RHA585D

5. Disconnect vacuum hose from vacuum pump and connect it to refrigerant recycling equipment.

(open) Adapter valves (close) Vacuum aN hose

valve Additional | (open) i

Compressor Vacuum pump

SHA883C Discharging Compressor Low pressure

WARNING: gauge \ High pressure gauge Discharge only into your recycling equipment. Do not release From . y > evaporator To condenser refrigerant into the air. Use only authorized refillable refrigerant tanks for your recy- O cling equipment. Use of other tanks could cause personal Low pressure valve l injury. High pressure valve Refrigerant }+—*°

REFRIGERANT RECOVERY

recycling Additional valve equipment

1. Connect vacuum hose to refrigerant recycling equipment SHA890C and open additional valve and adapter valves.

2. Open both valves of manifold gauge set. Make certain Air purge line Refrigerant tank refrigerant tank ‘‘Gas”’ and “‘Liquid’’ valves are open. (Yellow hose)

3. Piug unit’s power cord into a suitable AC outlet and turn on “Main Power’”’ switch.

4. Turn on ‘‘Recovery”’ switch.

5. Depress ‘Start’ switch. Compressor will start. Compressor will shut off automatically when recovery is complete.

Watch for pressure rise to above 0 kPa (0 kg/cm’, 0 psi)

within two minutes. If this occurs, repeat this step. Liquid line Gas line (Blue hose) -~ (Red hose) SHA891C HA-27

Parts & tools for this job For Nissan 240SX

As an Amazon Associate we earn from qualifying purchases.