DISASSEMBLY (Model R200V) - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › DISASSEMBLY (Model R200V) - Nissan 240SX 1991-1992 Workshop Manual
DISASSEMBLY (Model R200V)
DISASSEMBLY (Model R200V)
Pre-inspection Before disassembling final drive, perform the following inspec- tion. e Total preload 1) Turn drive pinion in both directions several times to set bearing rollers. 2) Check total preload with Tool. Tool number: ST3127S000 (See J25765-A) —_— Ms Total preload:
__ oe , Tool
SPDO56A =
1.4 - 1.7 N-m (14 - 17 kg-cm, 12 - 15 in-Ib)
e Ring gear to drive pinion backlash Check ring gear to drive pinion backlash with a dial indicator at several points. Ring gear to drive pinion backlash:
0.10 - 0.15 mm (0.0039 - 0.0059 in)
SPD513 e Ring gear runout Check runout of ring gear with a dial indicator. Runout limit:
0.05 mm (0.0020 in) e Tooth contact Check tooth contact. (Refer to Adjustment.)
Differential Carrier
1. Using two 45 mm (1.77 in) spacers, mount carrier on Tool. Tool number: KV38100800 ( — )
2. Paint or punch matchmarks on one side of the side bearing Cap so it can be properly reinstalled. Bearing caps are line-bored during manufacture. Replace them in their proper positions.
PD-31
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.