DISCHARGING, EVACUATING, CHARGING AND CHECKING - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › DISCHARGING, EVACUATING, CHARGING AND CHECKING - Nissan 240SX 1991-1992 Workshop Manual
DISCHARGING, EVACUATING, CHARGING AND CHECKING
DISCHARGING, EVACUATING, CHARGING AND CHECKING
Discharging Compressor
Low pressure
High pressure Ll —_——e \ gauge
WARNING: ~ gauge \ From _ Discharge only into your recycling equipment. evaporator To condenser Do not release refrigerant into the air. Slowly open the valves to discharge the refrigerant. If they are opened quickly, compressor oil will also be discharged. High pressure valve Refrigerant Vacuum pump valve recycling equipment SHA734C Evacuation Compressor Low pressure High pressure gauge gauge
EVACUATION PROCEDURE
From evaporator | ——
1. Completely tighten the low pressure and high pressure To condenser adapter valves. Refrigerant container Turn on the high and low pressure service valves. Low pressure valve , Open the high and low pressure valves and vacuum pump af (close) =
\ High pressure valve
valve of the manifold gauge set. (open) Run the vacuum pump. Vacuum Vacuum pump valve Charging cylinder pump SHA735C Perform evacuation for more than five minutes to stabilize the vacuum inside the system. Check to ensure that the low pressure gauge indicates —98.6 to —101.3 kPa (—740 to —760 mmHg, —29.13 to —29.92 inHg). Shut off the high and low pressure valves and vacuum -101.3 kPa pump valve of the manifold gauge set. (-760 mmHg, '-29.92 inHg)
—_— cS = RHA597B
CHECKING AIRTIGHTNESS
High pressure Low pressure ae gauge
1. Shut off the high and low pressure valves and vacuum gauge pump valve of the manifold gauge set, and leave the system as it is for 5 to 10 minutes. |
is| return
lowed. Make sure that the needle of the low pressure gauge will not move back toward the atmospheric pressure side (gauge pressure 0). If any reverse movement is noted, it indicates poor system “a7 cH airtightness. Service the system until airtightness is complete. TOK If pressure changes approx. 13.3 kPa (100 mmHg, 3.94 inHg) in 10 minutes, the refrigerant in the system will be exhausted in about one month. Low pressure valve cock [LO] (close) To high To low To pressure vacuum pressure service service pump valve valve High pressure Vacuum pump valve valve cock cock (close) [Ht] (close)
RHAS98B HA-29
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.