Gear Components (Cont’d) - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › Gear Components (Cont’d) - Nissan 240SX 1991-1992 Workshop Manual
Gear Components (Cont’d)
ASSEMBLY
Gear Components (Cont’d)
Tool C @ Use the left chart when deciding the reading torque. Torque wrench (Length of torque wrench vs. setting or reading torque) \ \
9. Tighten countershaft lock nut.
(5° i= Al lock By mz @ Always use new lock nut. ~ Lom (ft) ————_»
0.10 m (0.33 ft) N-m — (kg-m) (ft-lb), 157 r i16) ; | | , pper limit line (110) 147 110)+ @ (15) ® L o 2 137 @ (100)F (44) F . 427 . (13) © (90)t 118 r (12) (80)! 198 Lower limit line 441)04 05 O06 07 08 4 1 l m (1.5) (2.0) (2.5) (ft) SMTO004A L: Length of torque wrench Mainshaft Counter
10. Stake mainshaft lock nut and countershaft lock nut with a punch.
11. Measure gear end play. For the description, refer to DIS-
ASSEMBLY for Gear Components.
|
Shift Control Components
[ ;
1. Install shift rods, interlock plunger, interlock balls and check
Fork rod
. aie
r balls. pooN A
(1st & 2nd)
Lo oy
Fork rod
RY |
(3rd & 4th)
— 4 NS KS2 Interlock plunger ball
SMT992
a. 1st-2nd shift fork
SMT989 MT-24
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.