ASSEMBLY (Model R200V) - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › ASSEMBLY (Model R200V) - Nissan 240SX 1991-1992 Workshop Manual
ASSEMBLY (Model R200V)
ASSEMBLY (Model R200V)
Differential Carrier (Cont'd)
8. Turn drive pinion in both directions several times, and measure pinion bearing preload. Pinion bearing preload:
1.1 - 1.4 N-m (11 - 14 kg-cm, 9.5 - 12.2 in-Ib) When pinion bearing preload is outside the specifications, replace pinion bearing adjusting washer and spacer with a different thickness.
9. Select side bearing adjusting washer. Refer to ADJUSTMENT.
10. Install differential case assembly with side bearing outer races into gear carrier.
SPD919
11. Insert left and right side bearing adjusting washers in place between side bearings and carrier.
SPD924
12. Drive in side bearing spacer with Tool. Side bearing \ Tool number: KV38100600 (J25267) spacer Spacer location: Right side See | Wr
SPD559
13. Align mark on bearing cap with that on gear carrier and install bearing cap on gear carrier.
SPD889 PD-46
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.