Assembly (Cont'd) - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › Assembly (Cont'd) - Nissan 240SX 1991-1992 Workshop Manual
Assembly (Cont'd)
ASSEMBLY
Assembly (Cont'd)
10. Adjust brake band. Tighten anchor end bolt to specified torque.
a. Anchor end bolt: ©):4-6 Nem (0.4 - 0.6 kg-m, 2.9 - 4.3 ft-lb) Back off anchor end bolt two and a half turns.
b.
c. While holding anchor end pin, tighten lock nut.
. Install terminal cord assembly. ooh — Install O-ring on terminal cord assembly. Apply petroleum jelly to O-ring. Ter Compress terminal cord assembly stopper and install ter- minal cord assembly on transmission case.
12. Install control valve assembly.
Install accumulator piston return springs B, C and D. Free length of return springs: Unit: mm (in)
Item
58.4 (2.299) Free lerigth 66 (2.60) 45 (1.77)
Install manual valve on control valve.
b. @ Apply A.T.F. to manual valve.
AT-181
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.