TIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › TIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
TIMING CHAIN
TIMING CHAIN
Installation (Cont'd)
3. Install cam sprocket cover. e@ Apply a continuous bead of liquid gasket to front cover. e Be careful not to damage cylinder head gasket. e@ Be careful upper timing chain does not slip or jump when installing cam sprocket cover.
> Tighten cylinder head bolts. Engine Tightening procedure
@) Tighten all bolts to 29 N-m (3.0 kg-m, 22 ft-lb).
(®) Tighten all bolts to 79 N-m (8.1 kg-m, 59 ft-lb).
(©) Loosen all bolts completely
KOR
@ Tighten all bolts to 25 to 34 N-m (2.5 to 3.5 kg-m, 18 to 25
COLO: LN 7 ft-Ib).
(@) Turn all bolts 86 to 91 degrees clockwise, or if an angle
wrench is not available, tighten bolts to 75 to 84 N-m (7.6 to Tighten in numerical order.
8.6 kg-m, 55 to 62 ft-lb). SEM275D
ft-lb) m, Cr g a a o (k —_
Nem 29 / (3, 22+ © @/ torque
Tightening SEM276D
5. Install camshafts and camshaft brackets. intake camshaft Tighten in numerical order. OL O__@ 1 ____@, °
2! COL CWA
SVKOIOSE@ ee N aA AS —_ - j on Exhaust camshaft Tighten exhaust camshaft bracket Engine front in the same procedure. SEM277D
6. Install camshaft sprockets. Mating mark
7. Install chain guide between both camshaft sprockets.
SEM745D EM-19
Parts & tools for this job For Nissan 240SX
- PARTTiming belt kitSearch: Nissan 240SX timing belt kit
- TOOLEngine timing tool setSearch: Nissan engine timing tool set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
As an Amazon Associate we earn from qualifying purchases.