TIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › TIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
‹ Prev TIMING CHAIN - Nissan 240SX 1991-1992 Workshop ManualNext › OIL SEAL REPLACEMENT - Nissan 240SX 1991-1992 Workshop Manual
QUICK REFERENCE INDEXTIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
TIMING CHAIN
TIMING CHAIN
Installation (Cont'd)
Install rubber plugs as follows.
8. Apply liquid gasket to rubber plugs. (1)
Install rubber plugs, then move them by hand to uniformly
(2)
spread the gasket on cam sprocket cover surface.
Rubber plugs should be installed flush with the cylinder
head surface.
Install chain guide between both camshaft sprockets.
9.
SEM285D
SEM933B Install distributor.
10.
1 piston is set at T.D.C. and that
Make sure that No.
distributor rotor is set at No. 1 cylinder spark position.
SEM262D Install rocker cover.
11. Install all spark plugs with high-tension cords.
12.
Connect injector harness connector and replace injector
13. tube assembly with injectors. Install the following parts.
14. Radiator shroud Cooling fan with coupling Air duct @
Install vacuum hoses, fuel tubes, wires, harness and con-
Tighten in numerical order. — nectors and so on. SEM286D EM-20
‹ Prev TIMING CHAIN - Nissan 240SX 1991-1992 Workshop ManualNext › OIL SEAL REPLACEMENT - Nissan 240SX 1991-1992 Workshop Manual
Parts & tools for this job For Nissan 240SX
- PARTTiming belt kitSearch: Nissan 240SX timing belt kit
- TOOLEngine timing tool setSearch: Nissan engine timing tool set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
As an Amazon Associate we earn from qualifying purchases.