Workshop Manuals Factory service & repair Nissan and Datsun
01 QUICK REFERENCE INDEX02 Front Cover03 Foreword04 Table of Contents05 General Information06 Windshield Header Trim07 Windshield Header Molding08 Weatherstrips and Retainers09 Rear Seat10 Quarter Trim Panel11 Quarter Window and Regulator12 Door and Door Window13 Seat Belts14 Back and Quarter Belt Moldings15 Headliner Assembly16 Top Cover Assembly17 Backlite Assembly18 Stay Pads, Side and Rear19 No. 1 Bow20 No. 2 Bow21 No. 3 Bow22 No. 4 Bow23 Rear and Side Rail24 Hydraulic System25 Electrical26 Deck Lid Hinge and Trunk Trim27 Body Structural28 Index29 Back Cover30 QUICK REFERENCE CHART
Nissan and Datsun Nissan 240SX 1991-92 Workshop Manual01 · QUICK REFERENCE INDEX
01 · General

DISCHARGING, EVACUATING, CHARGING AND CHECKING - Nissan 240SX 1991-1992 Workshop Manual

Make
Nissan and Datsun
Model
240SX Nissan 240SX 1991-92 Workshop Manual
Section
General › DISCHARGING, EVACUATING, CHARGING AND CHECKING - Nissan 240SX 1991-1992 Workshop Manual
QUICK REFERENCE INDEXDISCHARGING, EVACUATING, CHARGING AND CHECKING - Nissan 240SX 1991-1992 Workshop Manual

DISCHARGING, EVACUATING, CHARGING AND CHECKING

DISCHARGING, EVACUATING, CHARGING AND CHECKING

Evacuation (Cont'd)

4. Perform evacuation for more than five minutes to stabilize the vacuum inside the system. Check to ensure that the low pressure gauge indicates —98.6 to —101.3 kPa (—740 to —760 mmHg, —29.13 to —29.92 inHg). —101.3 kPa (—760 mmHg,

5. Shut off the high and low pressure valves and additional —29.92 inHg) valve.

: SHA953C

CHECKING AIRTIGHTNESS

1. Shut off high and low pressure valves and additional valve, Low pressure High pressure and leave the system as it is for 5 to 10 minutes. gauge gauge

2. Make sure that the needle of low pressure gauge will not move back toward the atmospheric pressure side (gauge pressure Q). Needle _q- (reuse return (ts “ If any reverse movement is noted, it indicates poor system air- allowed. tightness. Service the system until airtightness is complete. If pressure changes approx. 13.3 kPa (100 mmHg, 3.94 inHg) in 10 lan minutes, the refrigerant in the system will be exhausted in NU IN) Ww about one month. EVACUATION Low pressure valve cock If no abnormality is found during airtightness check, perform [LO] (close) evacuation again for more than 20 minutes. Tolow To To high Pressure vacuum

1. Run vacuum pump. pressure service pump _ service

2. Open high and low pressure valve and additional valve. valve valve High pressure

3. Evacuate for more than 20 minutes. valve cock [HI] (close)

4. Close high and low pressure valves and additional valve.

SHA854C

Charging Refrigerant

SETTING OF CHARGING CYLINDER

1. Make sure that inlet and outlet valves of charging cylinder are closed.

2. Slowly open liquid line valve of refrigerant tank.

3. Slowly open inlet valve of charging cylinder. (slowly The refrigerant will flow into the sight glass of charging cylin- open) der as inlet valve is opened. inlet vaive (slowly open) valve (close) RHA677B

4. Slowly open upper vent valve to release pressure from Vent valve (stowly open) charging cylinder. While doing so, continue charging until required amount of refrigerant is reached. The refrigerant volume changes with temperature and pres- sure. It is necessary to charge refrigerant with a little more than 9 | | t E ia required amount (indicated on sight glass).

5.

Close inlet valve and upper vent valve of charging cylinder.

T q glass HA-29 RHA678B

Parts & tools for this job For Nissan 240SX

As an Amazon Associate we earn from qualifying purchases.