TIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › TIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
TIMING CHAIN
TIMING CHAIN
Installation (Cont'd)
6. Install front cover. a
Apply a continuous bead of liquid gasket to front cover.
e
ialer oe ee nead
oe oy)
Becareful not to damage cylinder head gasket.
ssket e ~ oy ——- Be sure to install oil seal. = e —— Ach | :
7.
Install the following parts:
@ . p H e
Crankshaft pulley
Oil strainer
e
C) Oe \\
Ox Pe
e
Oil pan
CJ Component parts below the engine = e Air compressor idler pulley e Front cover SEM563D New cylinder head gasket e Idler shaft e
Install cylinder head and temporarily tighten cylinder head
8. bolts when installing front cover. Temporarily tighten cylinder head bolts. This is necessary e Cylinder head bolt washer to avoid damaging cylinder head gasket.
Besure to install washers between bolts and cylinder head.
e ( ) ( ) 4 Cylinder head side
SEM877A
UPPER TIMING CHAIN
Install lower timing chain.
1. Refer to “LOWER TIMING CHAIN” in “‘Installation”’.
Install upper timing chain, chain tensioner and chain guide.
2. 2) )(o Set upper timing chain on the idler sprockets, aligning ) e 9 mating marks.
Mating mark N (Gold) OF seme1so EM-17
Parts & tools for this job For Nissan 240SX
- PARTTiming belt kitSearch: Nissan 240SX timing belt kit
- TOOLEngine timing tool setSearch: Nissan engine timing tool set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
As an Amazon Associate we earn from qualifying purchases.