PRECAUTIONS AND PREPARATION - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › PRECAUTIONS AND PREPARATION - Nissan 240SX 1991-1992 Workshop Manual
PRECAUTIONS AND PREPARATION
PRECAUTIONS AND PREPARATION
Precautions @ When installing rubber parts, final tightening must be carried out under unladen condition* with tires on ground. * Fuel, radiator coolant and engine oil full. Spare tire, jack, hand tools and mats in designated positions. @ When removing each suspension part, check wheel alignment and adjust if necessary. @ Use Tool when removing or installing brake tubes.
SBR500
Preparation
SPECIAL SERVICE TOOLS
Too! number (Kent-Moore No.) Description Tool name HT72520000
Removing tie-rod outer end and Jower
(J25730-A) ball joint Ball joint remover
HT71780000 Removing and installing coil spring ( - ) Spring compressor
$T35652000 Fixing strut assembly ( - ) Strut attachment
GG94310000 Removing and installing brake piping ( - ) Flare nut torque wrench
FA-2
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.