TIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › TIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
TIMING CHAIN
TIMING CHAIN
CAUTION: e After removing timing chain, do not turn crankshaft and camshaft separately, or valves will strike piston heads. Removal
UPPER TIMING CHAIN
1. Drain coolant from both cylinder block drain plug and radi- ator drain cock. Refer to MA section.
2. Drain engine oil from drain plug of oil pan.
3. Remove vacuum hoses, fuel tubes, wires, harness and con- nectors and so on.
4. Remove front exhaust tube and A.I.V. pipe.
5. Remove the following parts. @ Air duct e Cooling fan with coupling e Radiator shroud
Remove nuts and bolts indicated by arrows. N | KAS 7 \
\ \ semedso
\ Engine front
6. Disconnect injector harness connector and remove injector
‘blecew’ requdtoe 55 |
tube assembly with injectors.
. > AS ee a injector
7. Remove all spark plugs with high-tension cords.
8. Set No. 1 piston at T.D.C. on its compression stroke.
SEM262D EM-13
Parts & tools for this job For Nissan 240SX
- PARTTiming belt kitSearch: Nissan 240SX timing belt kit
- TOOLEngine timing tool setSearch: Nissan engine timing tool set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
As an Amazon Associate we earn from qualifying purchases.