TIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › TIMING CHAIN - Nissan 240SX 1991-1992 Workshop Manual
TIMING CHAIN
TIMING CHAIN
Installation (Cont'd)
3. Install cam sprocket cover. Apply a continuous bead of liquid gasket to front cover. Be careful not to damage cylinder head gasket. Be careful upper timing chain does not slip or jump when installing cam sprocket cover.
Tighten cylinder head bolts. * *° Tightening procedure Tighten all bolts to 29 N-m (3.0 kg-m, 22 ft-lb). Tighten all bolts to 79 N-m (8.1 kg-m, 59 ft-lb). Loosen all bolts completely ©©e6 Tighten all bolts to 25 to 34 N-m (2.5 to 3.5 kg-m, 18 to 25 ft-Ib). @ Turn all bolts 86 to 91 degrees clockwise, or if an angle wrench is not available, tighten bolts to 75 to 84 N-m (7.6 to
8.6 kg-m, 55 to 62 ft-Ib). SEM275D = £ ® © E79 | o (8.1, 59) 7 <~ / E / 2 / / @ 29
JS pam (3, 221 ©
@/ 5} o £ 5 © ro
x.) eK SEM276D
5. Install camshafts and camshaft brackets. Intake camshaft. Tighten in numerical order. @+— W—~_@_@, o CHUA SIVLOTOD@) 9 tf ° ° il Exhaust camshaft Tighten exhaust camshaft bracket in the same procedure. SEM277D
6. Install camshaft sprockets.
7. Install chain guide between both camshaft sprockets.
SEM745D EM-18
Parts & tools for this job For Nissan 240SX
- PARTTiming belt kitSearch: Nissan 240SX timing belt kit
- TOOLEngine timing tool setSearch: Nissan engine timing tool set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
As an Amazon Associate we earn from qualifying purchases.