CYLINDER BLOCK - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › CYLINDER BLOCK - Nissan 240SX 1991-1992 Workshop Manual
CYLINDER BLOCK
CYLINDER BLOCK
Assembly (Cont'd)
5. Install pistons with connecting rods. EM03470000 Install them into corresponding cylinders with Tool. a (J8037) e Be careful not to scratch cylinder wall by connecting rod. e Arrange so that front mark on piston head faces toward front of engine. ENibe Ve SEM269C
b. Install connecting rod bearing caps. Tighten connecting rod bearing cap nuts to the specified torque. Connecting rod bearing nut: (1) Tighten to 14 to 16 N-m (1.4 to 1.6 kg-m, 10 to 12 ft-lb). (2) Tighten bolts 60 to 65 degrees clockwise with an angle wrench, or if an angle wrench is not available, tighten them to 38 to 44 N-m (3.9 to 4.5 kg-m, 28 to 33 ft-lb).
6. Measure connecting rod side clearance. Connecting rod side clearance: Standard
0.2 - 0.4 mm (0.008 - 0.016 in) Limit |
0.6 mm (0.024 in) If beyond the limit, replace connecting rod and/or crank- shaft.
$T16610001
REPLACING PILOT BUSHING
(J23907)
1. Remove pilot bushing (M/T) or pilot converter (A/T). or suitable tool
SEM916A
2. Install pilot bushing (M/T) or pilot converter (A/T).
Crankshaft side
AIT SEM163B EM-44
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.